Geoplast Consulting developed the structural works executive project for the office building of the new Gruppo Grassi production facility, which will be built in the Municipality of Montale, province of Pistoia. Our team actively collaborated with architectural firms The Studio Giuseppe Passaro Architects and Studio Maistro GPa Studio and the contractor Engineering Costruzioni to realize a building of considerable architectural complexity. New Nautilus Evo was used to reduce the use of concrete while improving seismic resistance.
The Mahboob Bin Al Ruhail Mosque project presented a challenge due to its 26-meter spanning slab and 6-meter cantilever. Our consulting team calculated the New Nautilus Evo slab and analyzed its interaction with the overall structure.
Potenza Hospital was built with an isolator at the base to counteract seismic forces. Our team designed the slabs from the ground to the top floor, with careful consideration of the heavy loads from the escalator and the substantial seismic forces at the isolator base.
The western extension of Roland Garros Airport on Réunion Island featured a roof with substantial structural loads that required careful consideration. The Geoplast team closely analyzed the interaction between the columns and the New Nautilus Evo slab, focusing on the roof construction phase.
A commercial building in Tivoli featured a deep, 9-meter foundation and a total elevation of 14 meters from the ground up. Our team designed a specialized foundation that functions as a diaphragm, along with a bidirectional slab system in the elevations, ensuring the entire structure is capable of withstanding seismic loads.
The Nursery School of Pescara had a unique butterfly-shaped plan. Our team designed the ventilated foundations and slab to accommodate the project’s distinctive shape and the randomly arranged columns with a 14-meter span.
The Villa Karma project featured an 18-meter span at the center of its structure. Our consulting team assisted Engineer Cavagnoli in evaluating slab deformations on the open sides, where a large glass window was to be installed, and supported him in coordinating the steel reinforcement project for the slab.